Saturday, November 29, 2014

Floors

Today is the end of a very busy week.  The floors just need a layer of poly gloss and then they will be done.  One more large room was added to our floor list, so that slowed us down a bit.  The last ceiling has been painted and we're working on prepping the walls to paint 2 more rooms.  After that there is more baseboard to put up and a lot of trim work to be done.  So much work and so few days! The weather has still been very nice.  We are getting spoiled.  It will be a shock to go back to the cold and dark!  Next week will hopefully see the completion of some rooms.  We are working on 6 at present.  None of them have been able to be used for over 5 years, so we are excited to get them opened up again.  Thank you for all your prayers.  We are tired, but the work continues to go smoothly, for which we are very thankful.
The half floor round room.  Just needs a coat of poly and baseboards to be completed.

Upstairs round room.  

The day was so nice we decided to go to the orchard and do spelling in a tree.  

Matt and Drew fixing the floor in the lower round room before the floors were stained.

Great Hall.  We won't be able to do any work in this room.  

Balcony area from the first floor.  

Sunday, November 16, 2014

Saturday, November 8, 2014

Waterford/WexfordCrystal

Crystal helmet at Waterford Crystal factory.

Quay at Waterford.  

Main street Waterford.

Irish Sea.



Biscuit, Johanna and Eva's dog, enjoying the sand.


Wednesday, November 5, 2014

Viking artifacts at the museum in Dublin

Boys and their toys.

Clint and Molly doing their own construction.

276 feet of baseboard to paint.  Twice.

Viking ship in the archaeology museum of Dublin.

Old Viking weapons.

Viking houseware.

Little Viking child's boot.

Partially finished log boat.  It may be incomplete, but you can see how long it was.

Shopping mall in Dublin.  It was designed to look like a Victorian greenhouse.


Drew cutting baseboard.  He did a good job doing all the math and angles in his head.